Each quote covers different work
One allows for the retaining wall. One leaves it out. One sets aside a rough figure.
Upload your plans. We read every line and write out the full scope of works. Every builder prices that same scope, so you can see what sits behind each number.


The page changes to suit your questions and your next step.
Every builder prices to their own assumptions, so no two quotes cover the same work.
One allows for the retaining wall. One leaves it out. One sets aside a rough figure.
Three formats, three sets of inclusions, and no way to tell which number is complete.
The cheapest quote is usually the one that left the most out. The rest arrives later, at a price nobody competed on.
The fix
One scope of works,priced by every builder.
Four steps. You do the first one, we do the rest.
Start with your plans.
Your drawings, your reports, whatever your designer gave you. Add a few details about the project and that is your part done. Everything after this is ours.
AI auto-fill from plans
Upload your plans
Drop in your architectural plans as a PDF. We read them and fill out your project for you.
Drop your plans here, or click to browse
PDF · up to 28 MB
Your plans are read securely to fill the form. Nothing is published until you say so.
Your plans become one scope.
We read every drawing, report and specification, and write out every item of work they cover. Every scope item points at the page it came from. You approve it before any builder sees it.
Scope of works
Approved242 items of work, built from your documents. Every builder prices this same list.
Bulk excavation, cut and fill
The big earthmoving that levels a sloping block into the platforms the home sits on.
Civil C03, page 2, Rev B
Detailed excavation for footings and services
The precise trenches and pier holes dug for footings, slab edges and underground pipes.
Structural S02, page 4, Rev B
Every builder prices that scope.
Verified builders walk your scope line by line and answer the same questions under signature. Nobody quietly leaves an item out, and nothing turns up later as a variation you never agreed to.
1 builder on your round
1 builder joined your round
They have your plans and contact details and can message you. Answer their questions to help them price it. Tenders usually follow within days.
Builders on your round
1 of 3 spots takenCorten Build Co.
6 years in operation · Melbourne, VIC
What happens next
Builders are notified
Verified builders matching your scope and area are notified when your project goes live.
Builders join your round
Up to 3 builders take a spot, open your full plans, and can ask questions here. You are notified each time.
Compare and award
Priced, itemised tenders arrive side by side. Compare, message, and award the builder you trust.
See what each price actually covers.
We read every tender in full and set out where they differ, item by item: what each one has allowed for, what it has left out, and where the money can still move. Then you choose.
Single dwelling · Pascoe Vale, VIC
Tenders received
3
project live 14 days
Lowest tender inc GST
$712,800
highest $800,800 · 12% spread
Build period
30–36 weeks
Significant flags
2
raised across the round
What this round comes down to
The overview
Corten Build Co. is $37,000 cheaper on paper, but $105,000 of its price sits in allowances of its own choosing that Meridian Building Co has priced in full. If those allowances overrun their stated figures by more than 35%, the saving is gone. The decision is not which number is lower; it is how much you trust the allowances.
Where the money stands
Each bar is a tender price. The solid part is committed; the lighter tail can still move.
Corten Build Co.
$712,800inc GST
$543,000 committed · $105,000 in allowances that can move either way
Meridian Building Co
$753,500inc GST
Every dollar committed
Brightwater Homes
$800,800inc GST
Every dollar committed
Meridian Building Co
14 years in operation
Tender price inc GST
$753,500
34 weeks · keys May 2027
Fully priced, no allowances
No significant flags · 3 worth attention
Commentary offered
Significant
16% of the price can still move
$105,000 sits in provisional sums and prime costs (2 PS, 3 PC).
Before you decide: Ask which allowances they would fix if the documents were finalised now.
Corten Build Co.
6 years in operation
Tender price inc GST
$712,800
36 weeks · keys Jun 2027
Firm to 84% · $105,000 in allowances
2 significant flags · 6 worth attention
Significant
16% of the price can still move
$105,000 sits in provisional sums and prime costs (2 PS, 3 PC).
Before you decide: Ask which allowances they would fix if the documents were finalised now.
Side by side
The decision grid
Every row is the builders' own answers, lined up. A teal cell holds the strongest position on that line.
The money
The programme
Scope
Open any builder's full evaluation to see the working behind their dimension scores.
The same project, read differently
Where the tenders differ
9 scope items are treated differently across these tenders. Until each builder prices the same scope, their totals are not the same number.
Show all 9 lines
The pre-decision agenda
Before you decide
7 questions this round leaves open. Put them to the builders, and the decision usually makes itself.
For the round
CBFor Corten Build Co.
Nobody prices your job anonymously. Every builder is vetted before they see it, and the rules they price under are published before the round opens.
We check each builder’s ABN against the Australian Business Register, and their licence against the state register where one connects and by our team where it does not. A builder takes a spot on an open round only once both have passed. Insurances are declared under signature with the tender.
Each line points to the document, page and revision it came from, and anything we cannot trace is removed. The pack cannot be approved while anything is unread, and nothing reaches a builder until you approve it.
Every tender is read against the same six things: how firm the price is, how much of the scope it covers, how well it is prepared, who the builder is, how they deliver, and how believable the programme is. Each one shows its working, so you can see why one tender sits above another.
The contract is signed directly between you and your builder.
Our Preferred Partner register covers building designers, builders and finance brokers we know and work with. Tell us what you need and we will point you to the right one. No charge.
One platform, where Australia’s residential builds get organised.
Homeowners
bring the project
Plans in, tenders back, compared properly.
Building designers
bring the design
Tenders run under the practice’s name.
Builders
bring it to life
One list to price, no commission.
Finance brokers
back the build
Introduced when a client needs lending.
— Kate & Tom Fletcher · New build · Point Cook, VIC
“We’d already been quoted by two builders and the numbers were pages apart, impossible to line up. Putting the plans up here and getting everything back in the same format is what finally let us pick one without second-guessing.”
3
quotes to compare
$89k
high to low
$0
it cost us
A BuilderHQ publication
The Build Brief
A short weekly read on the economics of getting homes built in Australia. Plain language, every figure attributed to its source, and no opinion dressed up as news.
Victoria announces 10 business day assessments for eligible developments of up to four homes
Victoria has announced a faster planning assessment pathway for eligible developments of up to four homes on a block. A new report finds that a median-income household can afford around 12% of the homes sold nationally. And the Reserve Bank has signalled that another rate rise remains possible in September.
Read this issueIf yours isn’t here, email info@builderhq.com.au and a human answers.